BuildOrder uses AI to generate estimates, proposals, and contracts. Here's exactly where the numbers come from, how accurate they are, and how to make them more accurate over time.
Every line item in a BuildOrder document is priced using a three-source hierarchy. The AI always uses the most accurate source available and falls back to the next when data isn't there yet.
Your Rate Library Most accurate
If you've saved a price in your Rate Library — like "$95/sq for GAF Timberline HDZ" or "$85/hr labor" — the AI uses that exact number. No estimation. No averaging. Your price.
Location-adjusted AI estimates Good baseline
When an item isn't in your Rate Library, the AI estimates based on the job location (city + state). It knows that labor in San Francisco costs more than in rural Mississippi, and it adjusts accordingly. Your markup percentage is applied on top of material costs if you've set one.
National average fallback Rough estimate
If no location is provided, the AI falls back to national averages from its training data. These are reasonable ballpark numbers — a good starting point — but you should always review and adjust before sending.
Material prices fluctuate constantly — lumber, copper, shingles, drywall — and vary by supplier and region. The AI knows typical price ranges from its training data, but it can't know your supplier's current pricing.
Best practice: Add your most common materials to the Rate Library with the prices you actually pay (or charge). Even a handful of entries — shingles, LVP flooring, drywall, paint — will make a meaningful difference in accuracy. The AI uses your price for those items and estimates everything else.
If you've set a material markup %, that's applied on top of whatever the AI estimates for materials — so your margin is preserved even when the AI is filling in the blanks.
Contracts and proposals include state-specific terms and conditions generated by AI. The AI knows general contractor law by state — payment terms, lien rights, change order requirements, warranty standards — and incorporates those into the language.
These are solid starting points, written in plain contractor language. They cover the most common scenarios: scope changes, payment disputes, weather delays, site access, and warranty periods.
BuildOrder.ai is not a law firm and these documents are not legal advice. For high-value jobs or anything unusual, have an attorney review before signing.